OPTIMA: Optimisation   for Sustainable
Water Resources Management
   

The Case Studies: baseline scenarios

The parallel case studies constitute the core of the project, and thus command together the largest share of resources. They follow the same structure in terms of their objectives, the specific tasks, and the Deliverables, each with a report on the problem analysis and the optimisation results.

Location Country km² Nodes S/D % Rel.% B/C
Dhiarizos River CYPRUS 260 58 85.53 51.38 14.29
Gediz River TURKEY 18,000 92 50.24 57.82 1.82
Litani River, Tyr LEBANON 600 67      
Zarqa River JORDAN 4,120 95 73.37 21.17  
Wadi Zeimar/Alexander PAL/IL 500 41 75.19 99.13  
Melian River, Tunis TUNISIA 553 30 98.54 73.84  
Martil River, Tetouan MOROCCO 1,129 34 67.21 40.05  