![]() |
WaterWare Reference & User Manual | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Last modified on: Thursday, 20-May-10 18:23 CEST |
WRM web version: Recharge nodeA WRM scenario can include any number of recharge nodes (injection wells). A recharge node must be connected to an aquifer. If not connected, the recharge or injection flow is added to the outflow component of the water (mass) budget, but an error (warning) is generated at the level of the consistency checker. The recharge node is similar to an end node, its flow is from the surface water system to the groundwater.
Node Attributes
Dynamic Output Time Series:A recharge node has one (dynamic) input time series, which is at the same time its output into the groundwater:
Reports and Statistics:Time series for: recharge.Single flow time series graph, statistics table with average, min, max.
|
